Skip to content
ORMUS

Industries

Manufacturing

Downtime is visible the moment it happens, not at the end of the shift.

The sector’s challenge

On a production line every stoppage is a direct loss, yet the cause is usually reconstructed afterwards from memory. The plan-versus-actual gap surfaces at month-end, by which point it is too late to correct.

Our approach

Signals from the equipment are collected and stoppages are recorded with a cause code. The plan-versus-actual gap is visible within the shift. Maintenance is scheduled from real running hours and sensor readings rather than from a calendar.

Relevant services

Consultation on this practice

Describe your situation briefly — we will outline the options and the first step.