Seven stages. Each has an input, an output and an acceptance point — which is what stops “where are we” from becoming a discussion.

  1. 01

    Stage 1

    Discovery and analysis

    We study the current processes, systems, data sources and constraints, and agree together which number has to move.

    Deliverable: Current-state map, risks and solution options

  2. 02

    Stage 2

    Technical specification

    Functionality, integrations, roles, security requirements and acceptance criteria are written down and agreed.

    Deliverable: Specification, staged cost and schedule

  3. 03

    Stage 3

    UX/UI and prototype

    Interface logic is tested on a prototype first. A change here costs a fraction of the same change in code.

    Deliverable: Interactive prototype and design system

  4. 04

    Stage 4

    Development

    We work in two-week cycles. At the end of each, a working version is visible in the staging environment.

    Deliverable: Working builds in staging

  5. 05

    Stage 5

    Integration and testing

    Connections to existing systems are built, load and security testing is run, and everything is checked against real data.

    Deliverable: Integration document and test results

  6. 06

    Stage 6

    Launch

    Release plan, data migration, user training and a rollback scenario are prepared before go-live.

    Deliverable: Live system, documentation and training

  7. 07

    Stage 7

    Support and growth

    Monitoring, incident response, planned updates and the priorities for the next stage.

    Deliverable: SLA, monitoring and development plan